01 — Lead time
Lead time
Standard models carry a production lead time of 5–15 days from receipt of the deposit and confirmation of the order details. The exact figure depends on two things: the model mix, and the quantity per model. A single-model order of beam fixtures moves faster than a mixed container covering wash, beam, follow-spot and architectural lines.
One number per line item, not one number per container. Lead time is stated per line item on the proforma invoice rather than as one blanket figure, because a 200-unit container is usually built as several production batches. Where a model is temporarily out of stock, we will tell you before you pay rather than after.
02 — Where goods ship from
Where the goods ship from
Production and dispatch are based at our Guangzhou factory in Huadu District, and goods are normally handed over in Guangzhou. For container loading we work with the South China ports — Nansha and Huangpu in Guangzhou, and Yantian or Shekou in Shenzhen — and will quote whichever gives the better sailing for your destination.
03 — Incoterms
Incoterms
We quote under Incoterms 2020. EXW, FOB and DDP are the three most used; CIF, CFR and DAP are available on request. The table below is the short version of who does what.
| Term | We handle | You handle | Typical use |
|---|---|---|---|
| EXW | Packing, ready for collection at our Guangzhou works | Export clearance, inland haulage, main carriage, import | Buyers with their own forwarder in China |
| FOB | Packing, inland transport, export clearance to the named port | Ocean freight, insurance, import clearance | Most container orders; buyer controls freight cost |
| CIF / CFR | Freight to destination port (CIF includes marine insurance) | Import clearance, duties, inland delivery | Buyers who want a delivered port price |
| DAP | Delivery to your named address, not cleared for import | Import duties, taxes, customs clearance | Project sites with a local broker |
| DDP | Delivery to your address with duties and taxes paid | Nothing beyond providing import credentials | Clients without an import entity |
DDP needs an importer of record. DDP requires us to clear your country’s customs, so we need a valid importer of record, tax or VAT number, and a postcode we can actually deliver to. Where that is not available, DAP is the practical alternative.
04 — Payment terms
Payment terms
The standard structure is 30% deposit with the order, 70% balance before shipment. Production is scheduled on receipt of the deposit, and the balance falls due once the goods are built, tested and photographed — before the container leaves the factory, not after it sails.
Samples and trial orders
100% in advance, because the value rarely justifies a split payment.
Larger project orders
An irrevocable letter of credit at sight can be arranged; terms are agreed before the PI is issued.
Currency
USD, EUR or CNY, stated on the invoice.
Channels
T/T bank transfer as standard; PayPal and Western Union for small amounts where bank charges would dominate.
Bank charges are shared in the usual way: the sender pays their own bank’s fee, the receiver pays the correspondent bank’s deduction.
05 — Quotation validity
Quotation validity
Quotations hold for about 30 days from the date of issue. Stage lighting is copper, aluminium, LED and driver-board content, and all four move; a quotation that has sat for a quarter cannot be held. If you are waiting on a tender award or a venue approval, tell us and we will re-confirm pricing at the point you are ready rather than let you quote a stale number to your client.
06 — Packing
Packing
Fixtures are packed to survive export handling, not just a local van run:
- Standard — individual carton with foam or moulded protection, then a master carton on a pallet.
- Flight case — optional, sized to the fixture and quantity, with wheels, dividers and castor boards; branded cases are covered on the customization page.
- Export crates — plywood or timber. Solid-wood crating for destinations that enforce ISPM 15 must be heat-treated or fumigated and marked; plywood avoids the issue entirely, which is why we default to it.
Gross weight, net weight and carton dimensions appear on the packing list so your forwarder can quote before the cargo is ready.
07 — Shipping and insurance
Shipping modes and insurance
Full container (FCL) for fleet orders, LCL for smaller mixed loads, air freight when a project date is tight, and express courier for samples and spare parts. We recommend marine cargo insurance on every shipment; under CIF we place it at 110% of invoice value as a matter of course, and under FOB or EXW it is the buyer’s call. Goods travel at the buyer’s risk once they pass the ship’s rail or the carrier’s hands.
08 — Export documents
Export documents
The standard document set issued with each shipment:
- Proforma invoice (before payment) and commercial invoice
- Packing list with weights and dimensions
- Bill of lading, or air waybill for air freight
- Certificate of origin, or a preferential form (Form E, Form A) where the destination agreement applies — tell us at order stage, as it cannot be issued retroactively in every case
- Declaration of conformity and test reports for CE-marked product
HS classification is confirmed at booking. Harmonised System classification for LED stage luminaires generally falls under heading 9405; the precise sub-code is confirmed at booking against the actual product and destination, and should be checked with your broker before the first import.
09 — Voltage and plug
Voltage and plug
Fixtures are quoted for the destination market: 100–240 V wide-range where the model allows, or a fixed 110 V / 220 V build, with the plug type matched to the country — EU, UK, US, AU or CN. Tell us the destination at quotation stage; changing a build after production has started means a rework, not a plug swap.
10 — Duties and clearance
Duties, taxes and clearance
Under EXW, FOB, CIF, CFR and DAP, import duty, VAT or sales tax, and local clearance costs sit with the buyer. Under DDP they sit with us and are built into the price. Duty rates vary by country and by classification, so we quote the goods, not your tax bill, unless DDP has been agreed in writing.
11 — Order flow
Order flow
- Enquiry and model selection, with a configuration sheet per line item
- Proforma invoice issued — price, lead time, Incoterm, packing, validity
- Deposit received, production scheduled
- Pre-shipment inspection: our own QC, plus video or third-party inspection on request
- Balance settled, documents issued, cargo booked
- Shipment tracked and arrival supported; after-sales starts on delivery
12 — FAQ
Questions we are asked most
What is the usual lead time?
5–15 days for standard models from deposit, depending on model mix and quantity. The figure is stated per line item on the PI, not as one number for the whole container.
Can you ship DDP to my country?
Yes, where we can clear customs there. We need an importer of record, a tax or VAT number and a deliverable address. If that is not workable, we quote DAP so you clear the goods locally.
What are the payment terms?
30% deposit and 70% before shipment for standard orders. Samples are 100% in advance. Letter of credit at sight is possible on larger project orders.
How long is a quotation valid?
About 30 days. Material and exchange-rate movement makes longer holds impractical, but we will re-confirm rather than let you quote an expired price.
Where do the goods ship from?
Our factory in Huadu District, Guangzhou. Ports used are Nansha and Huangpu in Guangzhou, or Yantian and Shekou in Shenzhen, whichever sails better for your destination.
Can I use my own forwarder?
Yes, and EXW is the term for it. We hand over at the works with export packing done; your forwarder handles export clearance and carriage.